|
TEAM :
| Architect |
Manufacturer |
LineSync Architecture
www.LineSync.com
Warren, VT
(802) 496-5546
|
Rapid Deployment Housing Manufacturing Facility Inc.
|
| |
|
PROJECT SUMMARY:
Hybrid Housing Factory Built Core + On Site Assembly
- Higher Density 15 “core” Residences
- Green Space Courtyard Housing
- Factory Built House Core + Panel
- Assembled Free Space
- Medium Density 6 ”core” Town Houses
- Full Blanket Insulation Construction
- Factory Core + Roof & Wall Jacket
Rapid Deployment Housing Manufacturing Facility Inc.
- MANUFACTURING EQUIPMENT = Two Gantry Cranes + Rail Bed Tracks + Air Tools
- WALLS = Standard Shipping Containers, 20 & 40 ft long
- GRADE SURFACE = Crushed Stone + 4” 350 PSI XPS + Cross-lam OSB
- SECURE STORAGE = Building product inventory is stored in containers
AIA COMPETITION BOARDS:
   
|
|